Labels

Thursday, 24 November 2016

Scheduling

Below, I have provided a copy of the table which Ed was responsible for drawing up. We discussed suitable times and aspects which should be included in the time-table, however, he was responsible for this for the most part.

Another scheduling table may be necessary as we have an additional scene which we'd like to possibly film inside. 

*Just a note if there is any confusion: Due to Ed creating this table, the names which he included are 'Csenge' (me) and 'I' as in him, here, obviously this would be reversed. 


No comments:

Post a Comment